
Thanks to all for a great and enjoyable Gas & Oil Expo last month. The draw for the iPad mini was made by my 19 month old son, and the winner was Mr. Jim Little of Greenland Consulting. Greenland Consulting is an oil and gas consulting firm providing the energy and resource sectors with guidance from industry-leading specialists.
The winners of the free 12 month subscriptions to ProjectEngineer were:
Diana Hatsady, Precision Drilling
Kishor Patel, Apache Canada
Ray Martin, WorleyParsons
Paul MacLean, Enerplus Corporation
Frank Roberts, Pajak Engineering
Kevin Su, ConocoPhillips
Brenda Bozak, RJ Oil Sands
Irwin Rosenbauch, Rugged Engineering Designs
Quang-Hoa Hong, Sasol Canada
Jeff Golinowski, Trican Well Service
Scott Diehl, PFI Project Consultants Canada ULC
Aamir Rafiq Chaudhry, 3DGeo Exploration
Brian Emms, Husky Energy
Paolo Cancian, Genivar
Ryan Zhenyu Guo, Bayshore Petroleum
Cory Pawl, Allan R. Nelson Engineering
Claire Hong, Cenovus
Ziaur Rahman, Saipem Canada
Curt Jinjoe, ATCO Pipelines
Kevin Bar, Ausenco





Leave a Reply