Experience has taught me that the highest quality producer is quite often the lowest cost one. Say what? This is because of a factor called the Cost of Poor Quality, sometimes called Cost of Quality (COQ). Although production of high quality products and services usually requires an investment in equipment, people, or processes, the production of poor quality products undermines the process and creates significant additional cost.
COPQ is a measure of the cost an organization faces due to the provision of substandard products and services. It has 3 components:
- Prevention
- Appraisal
- Failure
It is expressed in numerical form as a percentage of sales, and can be mathematically calculated using the above three factors:
COPQ = Prevention + Appraisal + Failure
Most companies consider only the third factor (failure), which is a measure of rework, warranty returns, and so forth. It is considered a necessary evil to bring customer satisfaction levels back from negative to a neutral, competitor-inspired level. But what if your organization looked at the equation as a complete system? Failure is still considered, but preventing errors from happening, and catching them in production, are equally highly valued. The result is a prevention based system that will result in that ever elusive customer satisfaction increase.
Prevention
The best way to lower the cost of poor quality is to prevent poor quality products or services from being produced in the first place. This is where the biggest gains are possible. It is often the most underrated yet productive part of the COPQ equation. Investment in prevention results in higher customer satisfaction, which is often difficult to measure but at the same time the most important factor to corporate success.
Naturally, there is a trade-off when investment is made in prevention (at the front end) which reduces the number of defective products coming out of the back end. So an investment in prevention is not purely a cost proposition. After increasing product quality, support and technical assistance staff can be reduced once the results are achieved.
As a matter of fact, I would suggest that prevention is the least capital intensive of the three.
Here are a few ideas to include in an effective prevention program:
- Training
- Failure Mode and Effects Analysis
- Pilot projects
- Design of Experiments
- Process Capability / Process Performance
Appraisal
This part of the equation represents the cost of measuring quality throughout the production process. You would be surprised how often managers or executives rely on customer feedback (the unsolicited kind) to determine the overall quality of their products. The measurement of product quality at the production level is an essential part of any business unit. If someone asked you what the quality of your units products are, can you give them a good answer, with numbers? If you don’t know this, how are you to expand the business when you don’t have a strong sense of the quality of the products you are promoting?
Inspection, testing, and audits are used to determine quality. Unless the quality is 100%, they result in rework, scraps, and changes to workmanship, handling, specifications, and so forth. All of this is a cost, but an important one. The most important thing is prevention (above), so the better you are at that, the less you will spend on appraisal.
Failure
This factor in the equation represents external issues after the product has left the organization, such as warranty returns, rework, equipment replacement, and so forth. Clearly if the other two factors are done well, this, failure will be minimized, and this is the first priority. I believe you need a strong failure system in place but if the failure rate is high you need to go up the chain and consider prevention and appraisal first.
Failures can result in much more than the costs of returns and rework. Loss of orders, reputation, and future business are some of the more obvious consequences. Lawsuits and malpractice claims due to defective products or services can be a major one time cost. “Due diligence” is often a major consideration in the award of damages, and with a poor reputation the damages will not be on your side. Negotiations with suppliers and clients also take a turn for the worse, with future cost implications.
Typical Values
According to the Quality Digest, some typical values for Cost of Poor Quality in the manufacturing industry are as follows:
| Industry | COPQ as a Percentage of Sales |
|---|---|
| Aircraft engines / engine parts | 5.4 – 6.3 |
| Aircraft parts | 4.5 – 8.6 |
| Aluminum die castings | 5.3 – 7.1 |
| Aluminum extruded products | 4.4 – 7.0 |
| Automotive stampings | 5.3 – 7.0 |
| Engine parts | 5.0 – 7.1 |
| Fasteners | 6.2 – 7.1 |
| Forgings – non-ferrous | 5.9 – 6.9 |
| Mobile homes | 4.8 – 5.3 |
| Motor home / automotive bodies | 4.3 – 5.4 |
| Motor homes | 4.8 – 5.3 |
| Automotive parts / accessories | 6.1 – 8.0 |
| Motorcycles, bicycles / parts | 6.1 – 6.8 |
| Motors / generators | 5.2 – 6.1 |
| Storage batteries | 5.1 – 5.4 |
| Tubes / tires | 6.9 – 8.0 |
| Travel trailers / campers | 4.9 – 5.9 |
| Truck / bus bodies | 4.3 – 5.4 |
Example
Let’s take a producer of furniture. How do you calculate the cost of poor quality? Each of the three items should be itemized and listed. Man-hours and equipment can be calculated for each item.
- Prevention: Sending workers to training and improving processes to reduce defects. Six sigma projects are great for process improvement.
- Appraisal: Quality control processes, such as inspection before shipment, inspection of paint, and wood working equipment.
- Failure: Cost of warranty replacements, including the office work required to maintain the warranty program.
Have you ever calculated your Cost of Poor Quality? What were the results and what did you learn from the exercise? Leave your comments below, I’d love to hear from you.










Naveen Chander says
January 30, 2018 at 7:57 ami work in a plastic extrusion industry and here we calculate COPQ as a sum of Line Rejection cost+startup scrap cost+process scrap cost+internal rejections cost+cost of rework on part+cost of segregation+cost of external failures+appraisals cost+cost of mistake proofing systems+cost of training programs etc.