Project quality assurance is one out of three parts of a larger project quality system that ensures the project deliverables meet the planned quality standards. The other two are quality planning and quality control. Notice that the goal is not to produce the highest quality deliverables, only that the deliverables meet the quality standards in the original plan. This is because the cost of perfection, that is, zero defects, are rarely financially or practically feasible. That’s also why the planning stage is a critical part of the triad; It is the stage where the quality standards for the project are defined.
Performing quality assurance focuses on the processes that are in place to produce the project deliverables at the applicable level of quality. Normally called QA, it is the process of auditing and analyzing the systems which produce a product in order to improve their quality.
It should not be confused with Quality Control, which is a direct measurement of the deliverables for acceptance or rejection.
In the Project Management Body of Knowledge (PMBOK), Quality Assurance is performed throughout the duration of the project.
What is Quality Assurance?
Quality Assurance is the process of auditing the quality requirements and the results from quality control measurements to ensure that appropriate quality standards and operational definitions are used. The key benefit of this process is that it facilitates the improvement of quality processes.
In the PMBOK, the overall project management plan contains a component called a Quality Management Plan which is dedicated to project quality. This plan contains the relevant quality standards for the project’s deliverables, test methods and procedures, pass/fail criteria, and any other item of interest to project quality. Of particular interest within this plan is the quality assurance procedures.
Quality assurance primarily takes place via quality audits, which are investigations into the processes being used to produce the deliverables. The timing of the audits varies greatly depending on what industry and type of product is being produced.
When quality assurance activities identify a quality problem which leads to project changes, the project management plan is updated.
Quality Assurance asks the following questions:
- What are the applicable quality standards?
- How will quality be measured?
- Who will measure it?
- What will be measured? (i.e. How many units? Which types? Which processes?)
- When will it be measured?
- What is the criteria for rejection?
Example
During a project to develop a new line of furniture, quality control measurements yield a quality problem, “the legs of the couch are prone to break during shipping.” The project manager investigates via a quality audit, which involves taking various tests at points during the production process. If the project manager wishes to make changes to the production process, the project management plan is updated.
Quality Assurance vs. Quality Control
This is a frequent source of confusion.
- Quality assurance creates the systems to measure and control quality, in order to create confidence that quality products will be produced.
- Quality control measures the quality level of individual products/deliverables, and accepts/rejects them based on the criteria developed by quality assurance.
If you’re measuring the outputs, it’s QC. If you’re measuring the process, it’s QA.
Quality Control Data is an input into the Quality Assurance process, since the processes to measure quality might need to change to provide better assurance of quality.
Quality Assurance Audits
Quality systems should be consistently audited to ensure the processes being used are producing quality products. These audits involve:
- Analyzing quality control data to determine if quality problems exist (and revising the minimum quality standards if necessary).
- Identifying process improvements that will increase quality.
- Performing root cause analysis to determine necessary improvements.
- Determining preventative actions to deter future quality issues.
The project management team should always be on the lookout for improvements to the processes being used. The root causes can often be difficult to determine, so it is important to perform the necessary background research.
Developing preventative actions is often one of the best ways to develop confidence in the quality of the deliverables. Stakeholders who see consistently high product quality will gain confidence and allow a bit of breathing room when a quality issue occurs.
A quality audit can compare quality control data with other projects within the organization to see how the project is doing relative to previous projects. They can also be shared with clients and/or project sponsors.
Continuous Improvement
In spite of the implication of one-time improvements by performing quality audits, the real goal is continuous improvement. It is important to ensure that improvements are constantly on the mind not just of the project management team, but the project team on the ground as well.
Many organizations operate on the principle of Kaizen, a system of continuous improvement. This philosophy attempts to empower front line workers to make continuous improvements in the processes they use daily. It is not focused on major improvements. Rather, employees are encouraged to submit small, minor improvements to their managers any time they are encountered. Management is empowered to stop production to make the changes. Management is also encouraged, even judged, on the number of improvements suggested by their business unit. The more, the better. In many businesses, suggesting process improvements is seen as bad because you are exposing problems in the business unit. Therefore, Kaizen is a system of cultural focus on continuous improvement.
Quality Assurance Tools
When you’re analyzing a process with the intent of making improvements, there are usually many factors with complex relationships between them. Interrelated causes and effects can be difficult to understand and sort out. There are seven primary tools in the quality assurance professional’s toolkit.
- Affinity diagrams
These are effective in reducing the group bias when brainstorming. Instead of one facilitator or dominant group member leading the group to one conclusion, the group develops ideas individually and then collectively organizes them into categories for further analysis. - Process decision program charts
A structured method for determining risks and response plans. It is a good method of determining necessary contingencies. Level one contains a task or process, level two contains all of the potential risks to that process, and level three contains the response plans for those risks. - Interrelationship diagrams
These are used to flush out the primary causal factors when there are many, interrelated factors. A problem statement is generated, such as “The handle on the widget breaks too easily.” Then all of the relevant factors are written down in a circle and teams identify which factors are in a cause-effect relationship with other factors, drawing an arrow for each one. The factors which contain most of the arrow handles are the primary causes of the problem. - Tree diagrams
Useful for visualizing the parent-child relationships between tasks or processes. When there are a limited number of dependent relationships, writing out a tree diagram can flush out the primary causes of a defective product. - Prioritization matrices
These represent a good way to isolate the best course of action when multiple issues are present. They consist of ranking each issue on a scale of 1-10 (or similar) for specific criteria, like frequency of occurrence, feasibility, and customer benefit. The results are added together to obtain a score which can be used to make a decision to move forward with an improvement. - Network diagrams
The activity network diagrams are very helpful to determine what the existing processes are and how they interact with each other, which can be important to understand the potential improvements and what changes they will bring. - Matrix diagrams
A generic form of diagram that can be used to identify the relationships between factors, causes, and objectives. They can be 2 or 3 dimensional in that they can be shaped like an L, T, Y, C, or X.